Welcome to TBILISI! Openend on October 28, 1997 |
| Opened: | 1965 |
| Length: | 18.8 km |
| Gauge: | 1.524 m |
| Power Supply: | 825V |
| Current Collection: | 3 rail |
| Number of Stations: | 23 |
| Number of Cars: | 125 |
| Annual Throughput: | 144 mln. pass. |
The ground vestibul of Rustaveli station is shown in the picture (to the right).
You can also have a look at the system
map of the Metropolitan (the most current version, updated in 1997).
Subway token: