Rambler's Top100
[METASUBWAY TBILISI]
In english

Welcome to TBILISI!

Openend on October 28, 1997

---

Technical Information

Opened: 1965
Length: 18.8 km
Gauge: 1.524 m
Power Supply: 825V
Current Collection: 3 rail
Number of Stations: 23
Number of Cars: 125
Annual Throughput: 144 mln. pass.
---

General Information

Rustaveli Station   The ground vestibul of Rustaveli station is shown in the picture (to the right).
  You can also have a look at the system map of the Metropolitan (the most current version, updated in 1997).

Subway token:

token